Monday, November 18, 2013

A13: Massing Development & Model 1

The following massing study was a direct interpretation from the concept models and collages. 


1 comment:

  1. make sure the entry is clear from the visual corridor of the site, and be careful not to make the circulation route to the performance hall too far from the entry.

    ReplyDelete